Comparison

String Inverter vs Hybrid: Which Replacement Is Right?

Quick answer

For most Scottish homes replacing a failed inverter, a like-for-like string inverter is the simpler choice: it is quicker to fit, usually needs no G99 application and makes minimal change to your Feed-in Tariff. Choose a hybrid inverter if you plan to add a home battery soon, because it runs your panels and battery from one unit.

An honest, spec-based comparison to help you choose.

Last updated: 1 November 2026

Battery-ready hybrid inverter and home battery unit installed side by side on a utility room wall

What are the key facts?

  • String inverter: £800–£1,500, half-day install, usually no G99
  • Hybrid inverter: £1,500–£3,000, needs G99, battery-ready
  • Hybrid costs £700–£1,500 more — only worth it with a battery
  • We install through MCS-certified partners across all of Scotland
  • Interest-free credit up to £30,000, subject to status

Last updated: 1 November 2026

Verdict (October 2026)

For most homeowners replacing a failed inverter in Scotland, a like-for-like string inverter is the right choice. It is cheaper, faster to install, requires no G99 application, and does not affect your FIT arrangement. Choose a hybrid only if you have firm plans to add battery storage within 2–3 years — the extra cost (£700–£1,500) is only worth it if you add a battery, not for solar generation alone.

Head-to-Head Comparison

FactorString inverterHybrid inverter
Cost installed£800–£1,500£1,500–£3,000
Battery capabilityNone — solar onlyBuilt-in — add battery any time
DNO notificationG98 only (if same kW rating: none)Usually G99 (approval before install)
G99 wait time (SSEN)Not required30–65 working days (longer on islands)
FIT/SEG impactNone if same rating. Written notice if different model.Written notification to licensee required
Installation timeHalf day (once part arrives)Full day (wiring changes + battery prep)
Total time to generating3–5 working days from diagnosis3–6 weeks (waiting for G99 approval)
Typical warranty5–12 years (manufacturer dependent)10 years (Hanchu standard)
Efficiency97–98% (peak, fewer conversion stages)95–97% (additional DC-DC stage for battery)
VATDepends on the job — confirmed on your quote0% on battery installations until 31 March 2027

Price ranges. Source: Inverter Replacement Scotland installer quotes and manufacturer trade price lists, checked October 2026. Your quote reflects your specific system.

When Each Option Makes Sense

Option 1

Choose string inverter when:

  • Your existing system works well and you want it back online fast
  • You have no plans for battery storage in the next 3–5 years
  • You are on the Feed-in Tariff and want to minimise disruption to your arrangement
  • Budget is the primary consideration
  • You are in an SSEN constrained area where G99 waits are 4–6 weeks

Option 2

Choose hybrid inverter when:

  • You have firm plans to add battery storage within 2–3 years
  • You want to install battery at the same time as the inverter swap
  • Your electricity usage pattern favours self-consumption over export
  • You are on a time-of-use tariff and want to charge from the grid overnight
  • You run a heat pump or electric heating and use most of your power in the evening and over winter

String Configuration Constraints

Not every hybrid inverter is compatible with every existing panel array. Your existing string voltage and panel configuration constrain the replacement options. A 2012-era system with panels wired at high voltage for an older inverter may need rewiring to work with a modern hybrid. We assess compatibility as part of every diagnosis — you do not need to know your string configuration in advance.

Comparison based on manufacturer specifications and installation experience. Updated October 2026.

Electrician using a multimeter to check wiring before choosing a string or hybrid inverter

What a Hybrid Upgrade Involves

A hybrid upgrade replaces your failed string inverter with one that can also charge and discharge a home battery. The panels stay as they are. We check that your string voltage suits the new unit, fit the hybrid where the old inverter was or somewhere with better ventilation, and leave the battery connection ready even if you are not buying a battery yet.

Because a hybrid with a battery can export more power than the original system, the DNO usually needs to approve it under G99 before fitting. Your Feed-in Tariff licensee must also be told in writing so your generation meter readings stay valid.

Why Scottish Households Consider It

Solar output in Scotland peaks on long summer days, when many homes are empty, and drops right down from November to February. A battery stores daytime generation for the evening. With a time-of-use tariff, it can also charge from the grid overnight, which helps through the darker months.

If you have no plans for a battery, a like-for-like string inverter is usually the simpler and cheaper choice. Solar and battery installations are 0% VAT until 31 March 2027. Interest-free credit up to £30,000, subject to status.

String vs Hybrid Questions

Should I replace my inverter like-for-like or upgrade to hybrid?

Choose a like-for-like string inverter if your system works well and you have no plans for a battery — it is cheaper and faster. Choose a hybrid only if you plan to add battery storage within 2 to 3 years, because the extra cost only pays back when paired with a battery.

How much more does a hybrid inverter cost than a string inverter?

A hybrid inverter typically costs £700 to £1,500 more than a like-for-like string replacement. That premium is only worth paying if you add a battery, not for solar generation alone. We give honest advice based on your usage.

Does a hybrid inverter need G99 approval?

Usually yes. If the hybrid with battery can export more than the original system, a G99 application is needed before switch-on. A string replacement at the same rating typically needs only a G98 notification after the work.

Can I add a battery later if I fit a string inverter now?

Not without replacing the inverter again. A string inverter cannot manage a battery. If you think you might want storage within a few years, fitting a hybrid now — even without a battery — avoids a second inverter swap later.